International Bank – 132 x Device Server Relocation incl. Structured Cabling

A major international bank required a fully managed, end-to-end data centre migration incl. structured cabling, relocating 132 devices from the clients existing facility to their newly provisioned environment.

Financial Services Firm – Office IT Relocation & Desktop Deployment

A major financial services firm needed to relocate 200 desktop IT positions to a new London office, including the deployment of an additional 114 trader desk positions.

CIBT Visas / Newland Chase

Drawing on extensive experience in large-scale office IT migrations, JSC implemented a structured and proven methodology to ensure a smooth transition.

Co-Lo Migration London, UK

The investment banking client needed to consolidate its IT equipment, in particular migrating two data centres within a co- location facility into a single newly-provisioned area.

EBI-EMBL Data Centre Consolidation

The organisation responsible for managing the Human Genome project possesses more than 9PB of vitally important data, spread across two main data centres.

Royal Mail Group

Royal Mail Group was planning a relocation and consolidation programme in preparation for switching to a new data centre supplier.

International Co-Lo

A large IT outsourcing company, based in India, required more than 30 multi-site large scale server installations in co-location sites across the UK.

Oracle Migration – Grenoble, France

Oracle, one of the world’s largest computer technology corporations, wanted to consolidate its data infrastructure at its French office.

Relocation, Large Utility Company

A large regional utility company needed to relocate large amounts of infrastructure from the West Midlands to two other sites in the south east.

Office Rack Replacement Milan, Italy

A UK-based international investment company had an IT facility in Milan that required a full rack replacement.

Office Rack Replacement, Austria

A UK-based international investment company had an IT facility in Vienna that required a full rack replacement. Its existing rack capacity was insufficient, organised illogically, and lacked any cabling plan, labelling or power protection. 

White & Case – Network Hardware Deployment

White & Case, a global law firm specialising in major financial institutions, needed to upgrade its core, distribution and access network hardware.

Global Bank – Building Network Decom

JSC were engaged to complete the removal of all IT equipment from three major London sites and one based in Essex. 

Global Bank – Mass Audit

The client required a complete inventory of every asset within their 9-storey office building in a landmark location in London prior to starting a new office planning programme.

JSC FlexSupport (Fully Managed Engineering Service)

FlexSupport has been delivered for over 15 years to a large European organisation. This includes the provision of engineering, project management and data centre capacity management.

Twin Site Structured Cabling

A large Global healthcare company required structured cabling installation for a new twin site data centre client.

National Printer Rollout/Refresh

Large national brewery had a requirement to refresh printers across their national offices.

Resource Provision

Large national brewery had a requirement for additional technical resource to help support their national distribution business.

Mass Decommissioning and Disk Shredding

Large scale decommissioning and certified disk destruction exercise which saw the de-racking and serial number scanning of c.760 devices and over 14,500 drives. 

Global Bank – European Office Fit Outs and Moves

Extensive technical fit out and deployment for new client offices in Frankfurt, Milan, Stockholm and Paris.

Global Investment Management Firm – USA Office Fit-Outs

JSC provided remote management and engineering services for over 25 small trader and remote office fit outs across the USA.

Global Bank Remote Deployment (Z6) PC Rollout

Key partner for a major Global trading and backup trading infrastructure upgrade.  All trader PC’s were upgraded to the HP Z2 platform.

Global Bank – FlexSupport and Virtual Data Centre Manager Services

JSC’s FlexSupport (fully managed engineering service) delivered for 3 x DC locations and the main London based office comms rooms.

Global Bank Office Move & Trading Floor Fit Out

Supporting the client to provide technical implementation and trading floor fit-out services as part of a large flagship site office move for a Global Bank.

Global Bank – Data Centre Migration

JSC provided planning and project management for a data centre relocation from London Docklands to Equinix LD8. 